MDMC Barstow

Marine Depot Maintenance Command - Marine Corps Logistics Command,
Barstow

At MDMC Barstow there was a metal tower that was not well serviced and needed replacement in October of 2014. This was an area that needed the Tower Tech 15 Year warranty on the Fiberglass (FRP) structure as well as the Basin Heater for the cold time of the year. It was a closed loop, so a Plate & Frame HX was used to turn the 3-fan Tower Tech open loop cooling tower into a closed loop for the building.

We also provided a VAF Filtration Unit with a 50 micron screen for true filtration that was installed in a secondary loop inside the building to filter the condenser water.

Mechanical Engineer: SC Engineers
Mechanical Contractor: Astro Mechanical

What Tower Tech Replaced :